Campaign Planning and Changeover Times in the Process Industry

Author:  Dr. İlker Güçlü Published:  September 28, 2026 Related:  Production Planning and Detailed Scheduling Training · Production Planning Consulting

In brief: A line stopping for hours when changing from one product to another, and that time varying with the direction of the changeover, is a common situation in process industries. In sectors such as chemicals, paint, plastics, glass, and metals, a changeover means cleaning, adjustment, and quality approval. For this reason, production is planned in campaigns in which the same product is produced in batches at certain intervals. This article covers sequence-dependent changeover times, the product wheel approach, and the balance between campaign length and inventory.

Why Are Changeover Times Sequence-Dependent?

A frequently voiced observation in practice is that going from light to dark is easy and the reverse is laborious. Indeed, changing from a light color to a dark color, from low viscosity to high viscosity, or from a product without allergens to one with allergens usually takes little time. The changeover in the opposite direction requires extensive cleaning. In an example of a line with three products, the changeover times (hours) are assumed as follows (figures are for illustration purposes):

Changeover (→)A (light)B (medium)C (dark)
A (light)-13
B (medium)4-1
C (dark)53-

Comparing the two sequences, in the order A → B → C → A the total changeover time is 1 + 1 + 5 = 7 hours. The reverse order A → C → B → A takes 3 + 3 + 4 = 10 hours. Therefore, merely fixing the sequence gains 3 hours of capacity in every cycle. As the number of products increases, doing this calculation by hand is not possible; for lines with many products, it is recommended to search for the best sequence through optimization over the changeover matrix.

What Is a Product Wheel?

A product wheel can be likened to a clock face. In this approach, products are produced in the same order in every cycle and within a defined cycle time. The benefit of a fixed campaign pattern is seen quickly. Changeovers become predictable, raw material calls are stabilized, and planning of maintenance windows becomes easier. Every product does not have to be produced in every turn; high-volume products can be produced in every cycle, and low-volume products every two or four cycles.

How Is Campaign (Cycle) Length Determined?

There is a classic trade-off in determining cycle length. When the cycle is shortened, cycle stock decreases but total changeover time increases; when the cycle is lengthened, the opposite applies. How far the cycle can be shortened is determined by capacity:

Moving from a weekly cycle to a half-week cycle roughly halves the average cycle stock of each product. The appropriate cycle length depends on the balance between changeover cost and inventory carrying cost. On lines with many products, this balance is handled under the economic lot scheduling problem (ELSP).

In the process industry, capacity is determined less by machine speed than by
the sequence and frequency of changeovers.

How Is the Planning Hierarchy Set Up?

LevelHorizonDecision
S&OP12-18 monthsVolume by line, campaign frequency policy, stocking
Master production schedule4-12 weeksCampaign quantities and dates by product
Detailed scheduling1-2 weeksChangeover sequence, equipment assignment, cleaning and quality approval windows

The campaign plan cannot be built independently of the inventory policy approved in S&OP. The stock of a product that is produced infrequently must cover demand and safety stock over the cycle time until the next campaign. The subject of detailed scheduling is covered in detail on the What Is Detailed Scheduling? page.

Common Raw Material and Intermediate Constraints

In the process industry, a single master blend or base product can be the input of more than one finished product (inverse bill of materials). In this case, it is not enough to plan only the final product; intermediate tanks and buffer storage capacities must also be planned with campaign logic. The upper limit of the campaign quantity is often determined by tank capacity, shelf life, and quality approval times.

Technology and Digitalization: Campaign Planning with APS, MES, and Optimization

On the small line in the example above, comparing sequences on paper is easy. As the number of products increases, sequence-dependent changeover times turn into a sequencing problem that is difficult to solve by hand. Digital tools serve two purposes at this point. The first is finding better sequences through optimization, and the second is keeping the changeover matrix up to date with actual data.

Advanced Planning and Scheduling (APS) is a planning system based on optimization and heuristic methods that produces feasible plans and schedules by considering capacity, material, and priority constraints at the same time. Using the sequence-dependent changeover matrix, it optimizes campaign sequence and length, taking capacity and tank constraints into account together.

Manufacturing Execution System (MES) is the system that links the plan and actual production by monitoring shop floor work orders, machine status, production quantities, and scrap in near real time. It records actual changeover, cleaning, and first-product times and scrap; thus, the changeover matrix can be updated with measured values.

Enterprise Resource Planning (ERP) is the enterprise transaction system that records orders, inventory, purchasing, production, and finance transactions in a common database; it is the master data and transaction source for planning. It handles recipe, batch, and lot tracking and keeps the records of raw material and intermediate inventories.

Internet of Things (IoT) is the infrastructure in which sensors on machines, vehicles, warehouses, and products transmit data automatically over a network; location, temperature, status, and consumption data are collected without human input. Process status and tank inventories are reported instantly through reactor temperature, flow, and tank level sensors.

Artificial Intelligence (AI) and Machine Learning (ML) are methods that learn patterns from data to produce forecasts, classifications, and recommendations; machine learning is the sub-field of artificial intelligence that learns from data. They forecast changeover time and post-changeover scrap from process and quality data, and flag changeovers that take longer than expected.

Digital Twin is a virtual model of a factory, line, or supply network that is updated with data; it allows scenarios to be tested without affecting the physical system. It makes it possible to test product wheel and campaign length alternatives on a virtual model of the line without affecting production.

In trainings, it is often asked whether a choice will be made between artificial intelligence and optimization. These two approaches take on different functions and give more effective results when used together. Artificial intelligence forecasts inputs such as changeover time and scrap more accurately; optimization searches for the best sequence with these inputs. The value of both depends on the reliability of the data coming through the MES and IoT.

When the changeover matrix is not based on measured data, optimization merely finds the wrong sequence faster;
for this reason, first measure the changeovers, then optimize the sequence.

Implementation: Checklist

  1. Build the changeover time matrix between products for each line with measurement data.
  2. Determine a fixed production sequence (wheel) according to the changeover matrix.
  3. Calculate the shortest cycle time from capacity; determine the cycle together with inventory cost.
  4. Define a rule for producing low-volume products in certain cycles.
  5. Limit campaign quantities by tank capacity, shelf life, and quality approval times.
  6. Approve the cycle policy together with inventory targets in S&OP.
  7. Regularly update the changeover matrix with actual changeover times and scrap data from the MES.

Frequently Asked Questions

Is campaign production the same as batch production?

The two concepts are closely related. A campaign is a period in which the same product or product family is produced in several batches back to back. The main purpose is to reduce the number of changeovers.

Doesn't a product wheel reduce flexibility?

What is fixed in a product wheel is the sequence and the cycle; quantities are not held constant. Flexibility is preserved by adjusting product quantities to demand in each cycle. Leaving a small gap in the cycle for urgent demand is also recommended.

How are changeover times shortened?

At the shop floor level, the SMED approach is an effective method. In this approach, internal and external setup operations are separated, and cleaning and adjustment steps are standardized. On the planning side, the quickest gain comes from selecting the right sequence.

How often should campaign length be reviewed?

Campaign length should be reviewed immediately when demand, capacity, or changeover times change markedly. Apart from that, it is recommended to evaluate it at least quarterly, within the S&OP cycle.

Is optimization necessary for changeover sequencing?

Optimization is not mandatory in every case. On lines with few products, an experienced planner can build good sequences. However, as the number of products and the differences in sequence-dependent changeovers grow, the number of possible sequences grows rapidly; at this stage, optimization-based APS solutions make a distinct difference.

References

Related Optimum Planlama Trainings

Institutions We Work With in Chemicals and Materials

Some of the institutions to which we provide training and/or consulting services in the chemicals and materials sector are listed below. For all sectors, you can visit our References page.

Comments

Eurotec logo
“It was a comprehensive training in terms of content and explanation on production planning, material planning and detail scheduling. Having homework during the training and progressing with mutual questions and answers contributed to the interactive training and the reinforcement of what was told. I think this training will have a positive effect on increasing my contributions to my personal career and my company. On behalf of myself and my company, I would like to thank your institution.”
M**** H****, Production Planning Specialist, Eurotec (Production Planning, 2025)
TEI Alloys logo
“General Planning and Detail Scheduling training in production provided me with a catchy and perspective change with Mr. İlker's explanation.”
F**** E****, Production Planning Engineer, TEI Alloys (Production Planning, 2025)
“It was comprehensive and useful training supported by many applications not only theoretically but also in practice. Thanks...”
A**** A****, Senior Planning Specialist, Individual Participant (Production Planning, 2025)

To view all testimonials, click here.

Request a quote for training or consulting tailored to your organization.

Request a Quote  
Back to top